Important Note : Please Click on button to open Tender Details page.
Sl. No.
Tender Number
Brief Description of Tender
Publication Date
Last Date of Tender Paper collection
Date of Opening of Tender
View Tender Notice
231
ECL/GM/BA/E-Tender/25-26/ENM/20, dt. 04-Jul-2025
Proposal for repairing of 3.3kV, 250kW, 1489rpm, Marathon make squirrel cage induction motor, Sl No 3FF330770/1 pump motor at Shyamsundarpur colliery under Bankola area.
07-Jul-2025
14-Jul-2025 upto 18:00 Hrs.
15-Jul-2025 at 18:00 Hrs.
232
ECL/KNT/GM/EXCV/2025-26/12, dt. 07-Jul-2025
Repair of ends of hoisting cylinders and stairs, hand railings, engine belly guard of BEML BH60M dumper, Machine S. No. – 60867.
07-Jul-2025
23-Jul-2025 upto 12:00 Hrs.
23-Jul-2025 at 15:30 Hrs.
233
ECL/SID/AGENT/NIT/E&M/25-26/05, dt. 03-Jul-2025
Renovation of Electrical wiring of Manager office, Engineer office, winding Engine room (02nos) at Pit top of JK Unit of Siduli Colliery.
Transformer oil filtration & de-hydration of 07 Nos of Transformer of Mahabir Colliery under Kunustoria Area.
07-Jul-2025
22-Jul-2025 upto 11:00 Hrs.
22-Jul-2025 at 15:30 Hrs.
235
CKC/Agent/Tender/25-26/1815, dt. 04-Jul-2025
Cleaning of carbonaceous materials/fallen coal along 6WL from 40SD to 44SD and along 5 WL from 40SD to 44SD in South side Development District at Lower Kajora (R-VIII Top) seam of Central Kajora Colliery.
05-Jul-2025
18-Jul-2025 upto 13:00 Hrs.
18-Jul-2025 at 15:30 Hrs.
236
ECL/AGT/HC/E&M/NIT/2025-26/12, dt. 02-Jul-2025
Administrative approval for Repairing of Miscellaneous work at Hariajam Colliery.
Transportation of coal from tippler to coal depot and from coal depot to Modern Satgram Siding for a period of 2 years with respect to Ningha Colliery.
05-Jul-2025
NA
21-Jul-2025 at 13:30 Hrs.
238
ECL/KNT/GM/EXCV/2025-26/11, dt. 05-Jul-2025
Repair of both side blade frame, trunions and arms of BEML BD155 dozer, Machine S. No. – P13258.
Rimming of existing vertical borehole (100 mm dia/NX and 260 m depth ) to enhance the surface discharge of Mine water in respect of Dhemomain Incline Colliery.
Sealing of 5(Five) nos. of preparatory Isolation Stopping for panel -20 at R-VIII (Borachak) seam of Patmohona Colliery.
05-Jul-2025
17-Jul-2025 upto 17:00 Hrs.
19-Jul-2025 at 12:00 Hrs.
Best viewed on 1024 x 768 screen resolution.
DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL