Conversion of 11kV/6.6 kV, 2MVA transformer to 11kV/3.3kV. 2MVA for supplying power to LHCM-1 package at Shyamsundarpur Colliery under Bankola Area. (Retender).
Repairing of bottom roller, 8inch Dia x 1500mm long for steel chord belt of Shyamsundarpur colliery under Bankola area.(Retender)
26-Dec-2025
05-Jan-2026 upto 09:00 Hrs.
06-Jan-2026 at 09:00 Hrs.
187
ECL/GM/MA/SRV/25-26/1320/E44, dt. 26-Dec-2025
Construction of 3 Nos Ventilation stopping in Kalimati Top section under Kumardhubi Colliery.
26-Dec-2025
10-Jan-2026 upto 17:00 Hrs.
12-Jan-2026 at 10:00 Hrs.
188
ECL/GM/MA/SRV/25-26/1253/E43, dt. 26-Dec-2025
Monsoon preparation job of Kapasara Colliery for the year 2025-2026 and Filling and stabilization of the subsided site of main drain of Mandman Colliery and pot hole along the Right bank and Left bank of the main drain under the leasehold area of Mandman Colliery under Kapasara OCP Mugma Area ECL.
26-Dec-2025
10-Jan-2026 upto 17:00 Hrs.
12-Jan-2026 at 10:00 Hrs.
189
ECL/GM/MA/SRV/25-26/1273/E42, dt. 26-Dec-2025
Construction of (08) Eight nos. of P.C.C ventilation stoppings in between 56L and 57L off 0 dip and 1 dip in between 01 and 02 dip of 57L, 58L, 59L, 60L, 61L and 62L in 5/6 incline of Shampur-B Colliery.
26-Dec-2025
10-Jan-2026 upto 17:00 Hrs.
12-Jan-2026 at 10:00 Hrs.
190
MDP/Safety/25-26/1363, dt. 24-Dec-2025
Repairing and replastering of 6 nos ventilation stoppings at 4L/1D-2D,5L/1D-2D,6L/1D-2D,8L/1D-2D,10L/1D-2D,11L/1D-2D at 5&6 pit of Madhaipur Colliery.
25-Dec-2025
03-Jan-2026 upto 13:00 Hrs.
03-Jan-2026 at 15:00 Hrs.
Best viewed on 1024 x 768 screen resolution.
DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL