Replacing of 5 nos. old and damaged ventilation doors and repairing of the stoppings Containing those ventilation doors (3 at pit bottom and 2 at the bottom of fan drift) at R-VI seam workings of Chora 10 pit colliery, Kenda Area, ECL.
23-Feb-2026
09-Mar-2026 upto 12:00 Hrs.
09-Mar-2026 at 14:00 Hrs.
1993
GM/KND/AE(ENM)/55(TN)/25-26/77, dt. 21-Feb-2026
1. Shifting and installation of 2 nos of power transformer of New Kenda colliery 2.Supply and installation of lighting arrestor and surge arrestor 3. Shifting and renovation of 11KV and 550V overhead lines at Kondakuli 4. Urgent renovation of 440V overhead line from Masjid para HT Surface substation to CISF colony 5. Diversion and extension of overhead lines
23-Feb-2026
10-Mar-2026 upto 17:00 Hrs.
11-Mar-2026 at 17:00 Hrs.
1994
GM/KND/AE(ENM)/55(TN)/25-26/78, dt. 21-Feb-2026
1. Laying of MS pipes with supply and fitting of different types of hoses and accessories for firefighting 2. Installation of 6- inch pipeline from Quarry 1 to Quarry 2 for firefighting 3. Laying, fitting & replacement of 6inch and 4 inch dia MS dia MS
23-Feb-2026
10-Mar-2026 upto 17:00 Hrs.
11-Mar-2026 at 17:00 Hrs.
1995
GM/KND/AE(ENM)/55(TN)/25-26/79, dt. 21-Feb-2026
Maintenance of pipeline and pumps for day to day for a period of 6 months at New Kenda Colliery, Kenda Area.
23-Feb-2026
05-Mar-2026 upto 17:00 Hrs.
06-Mar-2026 at 17:00 Hrs.
1996
SDPA/Civil/G-11/25-26/153, dt. 23-Feb-2026
Repairing of Pipe lines at various places of Sodepur Central Workshop.
23-Feb-2026
02-Mar-2026 upto 18:00 Hrs.
03-Mar-2026 at 12:00 Hrs.
1997
ECL/GM/JNR/EnM/A2/25-26/127, dt. 21-Feb-2026
Fabrication of one no. 1400mm Loop Take-up Trolley and Installation of Loop Take Trolley after dismantling the existing Loop Take-up Trolley and Loop Boxes of 1400 3rd belt conveyor in main incline at MIC, Jhanjra Project Colliery.
Roof Bolting supports along 15D/27L to 34L to strengthen the roof for prep ration of Travelling roadway of Panel-22 in kenda (R-VI)seam of Jambad UG Colliery.
Side stitching of some coal pillar along 16D/30L to 34L at Panel-22 Bottom section Depillaring to strengthen the pillar in kenda seam of Jambad UG Colliery.
23-Feb-2026
06-Mar-2026 upto 13:00 Hrs.
06-Mar-2026 at 15:30 Hrs.
Best viewed on 1024 x 768 screen resolution.
DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL