Repairing of final drive by removal of 18 nos. broken bolts from LHS final drive and repairing of 02 nos. RHS Carrier roller mounting base of HS-34 Hyd. Shovel.
21-Nov-2025
30-Nov-2025 upto 15:00 Hrs.
01-Dec-2025 at 15:30 Hrs.
63
GM/KAJ/PCD/25-26/5000, dt. 04-Nov-2025
Side stitching of pillars in the panel CN-8(A) Bottom section in Chora (R-VI) Seam, No.6 Pit, Khas Kajora Colliery.
20-Nov-2025
02-Dec-2025 upto 17:00 Hrs.
03-Dec-2025 at 11:00 Hrs.
64
GM/KAJ/PCD/25-26/5002, dt. 04-Nov-2025
Lifting of existing old damaged pipes and lowering of new seamless pipes 150mm dia& 225m length in vertical stowing range of Bunker No. 2 at Jambad UG Colliery.
20-Nov-2025
02-Dec-2025 upto 17:00 Hrs.
03-Dec-2025 at 11:00 Hrs.
65
BMP/Meth/MGR/NIQ/25-26/2070, dt. 17-Nov-2025
Lifting of carbonaceous material/stone/coal & loading into tubs at Methani Colliery.
20-Nov-2025
27-Nov-2025 upto 16:00 Hrs.
28-Nov-2025 at 15:00 Hrs.
66
GM/KAJ/PCD/25-26/5001, dt. 04-Nov-2025
Conducting Drone-Based Demographic Survey and preparation of a detailed surface map, Plot/ House Hold wise Physical status verification. Composition with PJOC and PW U/G working Plan after Preparation & Updating, showing current surface status like built-up area classifying single storied, double storied, hutment, sāmi pucca etc. of Parascole village for further technical assessment in Connection with.
20-Nov-2025
02-Dec-2025 upto 17:00 Hrs.
03-Dec-2025 at 11:00 Hrs.
67
GM/PND/AE(E&M)/2025-26/173/965, dt. 15-Nov-2025
Rewinding & repairing of 50KVA,550V/440V Lighting Transformer of Madhaipur Colliery, Repairing & Rewinding of 315KVA,3.3KV/550V TSU at No 9 Pit of Madhaipur Colliery ,Rewinding & repairing of 150 HP, 1440RPM, 550V Induction Motor.
20-Nov-2025
01-Dec-2025 upto 18:00 Hrs.
02-Dec-2025 at 18:00 Hrs.
68
ECL/MA/EXCV/E-TENDER/24-25/28, dt. 19-Nov-2025
Engagement of one (1) nos. of Diesel Bowser at Mugma Area for transportation of diesel in diesel bowser from Kapsasra DDU to Rajpura and Kapasara DDU to C.P. Siding for 365 days provision of two extension each of six months.
20-Nov-2025
01-Dec-2025 upto 17:00 Hrs.
02-Dec-2025 at 09:00 Hrs.
69
GM/PND/AE(E&M)/2025-26/178/960, dt. 15-Nov-2025
REPAIRING & OVERHAULING OF (A) 11KV, 400AMPS, VCB PANEL, MODEL NO. TE/VCB-11 AT DARULA SURFACE SUBSTATION AND (B) 550VOLT 200AMPS ANDREW YULE MAKE ACB AT 14NO. LEVEL, 72 NO. RISE UNDERGROUND OF SOUTH SAMLA and COMPLETE REPAIRING & OVERHAULING OF 100HP,550VOLT PRABHU MAKE STAR DELTA STARTER AT SOUTH SAMLA UNIT OF MSAM COLLIERY.
20-Nov-2025
01-Dec-2025 upto 18:00 Hrs.
02-Dec-2025 at 18:00 Hrs.
70
ECL/HQ/GM(C)/QN/25-26/01, dt. 20-Nov-2025
Construction of temporary Chess floor (Platform) including supplying & placing of 2 feet garden chess pieces set (32 chess pieces) at CMD Office campus, ECL.
20-Nov-2025
26-Nov-2025 upto 17:00 Hrs.
27-Nov-2025 at 15:30 Hrs.
Best viewed on 1024 x 768 screen resolution.
DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL