Proposal for cleaning of debris mixed with Carbonaceous material along 17 Dip from 29L to 32L in Kenda(R-VI) seam of Parasea Colliery under Kunustoria Area.
12-Mar-2026
21-Mar-2026 upto 17:00 Hrs.
22-Mar-2026 at 15:00 Hrs.
765
ECL/GM/BA/E-Tender/25-26/ENM/393, dt. 11-Mar-2026
Repairing and maintenance of 08 (Eight) nos earth pit atKumardihi-A Colliery under Bankola Area.
12-Mar-2026
21-Mar-2026 upto 18:00 Hrs.
23-Mar-2026 at 18:00 Hrs.
766
ECL/GM/BA/E-Tender/25-26/ENM/392, dt. 11-Mar-2026
(1) Complete repairing and rewinding of 2nos 100KVA 550V 440V Lighting transformer with installation at upper dhowra and pankhadhowra of Bankola Colliery. (2) Complete rewinding and repairing of 500KVA 11KV 550Volt Power transformer installed at 11KV Water treatment plant Sub station under Bankola Area.
12-Mar-2026
21-Mar-2026 upto 18:00 Hrs.
23-Mar-2026 at 18:00 Hrs.
767
ECL/GM/BA/E-Tender/25-26/ENM/391, dt. 11-Mar-2026
Fire Resistance Rubber Lagging of 7(seven) nos of Drum of 800 mm belt Conveyors at KumardihiA colliery Bankola Area
12-Mar-2026
21-Mar-2026 upto 18:00 Hrs.
23-Mar-2026 at 18:00 Hrs.
768
ECL/GM/BA/E-Tender/25-26/ENM/389, dt. 11-Mar-2026
(A) Repairing of Water tanker No WB-398-0904 of Nakrakonda- Kumardihi B Colliery under Bankola Area. (B) Repairing of School bus no WB 37-3790 ofBnakola Area. (C) Repairing and overhauling of 10kL Water sprinkler tanker, vehicle no. WB39-B-0895 of Shyamsundarpur colliery under Bankola area.
12-Mar-2026
21-Mar-2026 upto 18:00 Hrs.
23-Mar-2026 at 18:00 Hrs.
769
ECL/GM/BA/E-Tender/25-26/ENM/390, dt. 11-Mar-2026
Repairing of (1) 320mm x 1450mm and 220mm x 1450mm pressure drum for 1200mm wide conveyor and (2) 508mmx1400mm pressure drum for 1200mm wide conveyor in CM project at NakrakondaKumardihi B colliery under Bankola area.
• CANCELLED
12-Mar-2026
21-Mar-2026 upto 18:00 Hrs.
23-Mar-2026 at 18:00 Hrs.
770
ECL/GM/BA/E-Tender/25-26/ENM/388, dt. 11-Mar-2026
(A) Repairing of main line and replacement ofdamage out door 11 mtr long tower lights with supply fitting ofsafety protection system advance at Digital Dispensary underBankola Area. (B) Repairing & maintenance, replacement of damage gasket with stud insulator and dehydration filtration of T/f Oil along with heat shrink terminal Kit joint in 95 sqmm XLPE cable in 11KV/440Volt 250 KVA lighting Transformer installed at Gulmohor club under Bankola Area.
12-Mar-2026
21-Mar-2026 upto 18:00 Hrs.
23-Mar-2026 at 18:00 Hrs.
Best viewed on 1024 x 768 screen resolution.
DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL